July 2021: A few weeks after separating the body from the floor I went over to help Paul strip the floor pan down to its bare chassis spine. To start, we had to remove the previously replaced floors by cutting as close to the main central tunnel as we could, but ensuring not to cut into the tunnel structure its self as this was where the floors would be spot (or plug) welded to. Using a trusty cold chisel, Paul then hammered out all the spot welds on the left side (passenger side RHD), as this was still the original factory floor because in 1997 we only had a ‘half’ floor fitted. On the right side the floor that was fitted in 1997 had been seam welded along its length to the chassis central spine. Initial thoughts were that this was going to be a problem but upon closer inspection the seam weld had been done on top of the remains of the old original floor. Thankfully, this allowed Paul to use his chisel and knock out the factory spot welds on the original floor and thus taking the newer welded floor left overs with it.

The central tunnel was covered in a tar based sound deadening board, so chipping and cleaning off this material was my job and something I could actually do. It didn’t take too long and by early afternoon the chassis was stripped bare. All that was needed was for the frame head to be replaced, but Paul would have to make up a jig to ensure the new frame head and the underside part of the Napoleon’s Hat, a section to be grafted in, would all align.

A few days later I got a message with pictures from Paul to say he spent a whole day on the chassis and got the new frame head on, new floors fitted, and also the Napoleon’s Hat section of the floor grafted in. He had a spare 1302 shell in his yard that he used to offer the floor up to ensure everything aligned as it should.

The following week I went over again to Pauls to see the results of his welding and look over the thorough job he had done. Later, we set to stripping down the IRS arms, spring plates, rear brakes, front TCAs and other small parts in readiness to be sent away for media blasting and powder coating.