

Four years later and plans were afoot to enclose the carport, I had built 20 years earlier, with walls, double doors and lay a concrete floor. With the restrictions of a UK lockdown from COVID-19 easing by May 2020, the Beetle was relieved of its resting place on the wooden block. The tyres were pumped up, with two of the four holding air, a third held air long enough to manoeuvre the car and the other had a split in the sidewall. It was then rolled out from the car port, first time since the summer 2000, and parked on the lawn alongside the carport with a load of other stuff.




The following weeks, during June through to August 2020, saw the carport become enclosed into a double garage/workshop with feather boarded exterior walls, glass windows and double folding doors. The ceiling was insulated a year later as condensation was still forming on the metal roof inside the workshop.












To keep the weight off the doors, opaque perspex windows were inserted to allow plenty of light in as well as keeping prying eyes out. The doors folded neatly so that I could open both doors outwards without having to move any car parked in front of the new garage/workshop.
The first job in the new workshop was to refurbish the front suspension on the Ford Corsair. With the Corsair being in the workshop, I had more room to manoeuvre about which freed up the garage, that the Corsair normally lived in, so I could dismantle the front struts on the bench and access my tools. You can read all about that here in my Corsair blog.