October 2021, and Paul delivered the the floor pan back home. Leading up to this point, I had stripped down the front struts with other steering components in readiness for sending away to be powder coated in the same bright white. I had tinkered with painting the gear lever gloss white but it wasn’t quite the right white when compared with the powder coating bright white and I also touched up the scuffed IRS arms with white Hammerite.

The next part of the plan was to get the brake master cylinder sent away for refurbishment, buy a couple of new flexi brake lines for the rear end with a little more pipe work added and the brake system would be mostly finished except for the front end connections to the front struts. However, with the ongoing body work during November, the budget was draining away and these items would have to go on hold.

Next post, the body.

Categories
pedals suspension

Floor Pan Rebuild

During August I took the opportunity to clean up the gearbox, first by soaking, scraping and scrubbing it with old petrol to loosen the dirt. It was followed by a more detailed clean using a degreaser before finally jet washing.

At the end of August 2021 going in to September, I had some time off work to spend a few days at Pauls Workshop to begin reassembling the components back on to the floor pan. It wasn’t as straight forward as I hoped and felt a little bit out of my depth and Paul was busy with other work but he set me up to use his sand blasting cabinet for most part of my first day. It was quite a fiddley process of which I cleaned up several large nuts, bolts, fastenings and the gear stick components.

1302S floor pan before anything was re-fitted
1302S floor pan before anything was re-fitted
Sand blasting nuts and bolts
Sand blasting nuts and bolts

Progress over the 3 days was slow but I had re-tapped all the threads on the floor pan that had been affected by the powder coating process. Paul fitted a new copper fuel line while I worked on new copper brake lines front to back with cleaned up unions and installed the foot pedals, hand brake with cables and new heater control cables. The heater cable guides needed a proper clean out and Paul devised a method utilising a long thin rod from a roof lining support rod and fitted it to a drill. The result eventually cleared the blockage of sand blasting grit coupled with years of dirt build up. All the other cable guides were treated the same and were all clear.

The powder coating of the floor pan was tested for its durability having got a proper drenching in some September downpours, unfortunately the new brake drums were exposed to this weather and suffered, so had to be cleaned up with a wire brush as they had developed some surface rust in a very short period. After a few Saturdays during September spent with Paul, the floor pan was coming together. Working on the trestles made access much easier to laying out and shaping the brakes lines, hand brake cables and heater cables. One oversight (of a few), there were old bushes in the independent rear suspension arms that hadn’t be removed prior to powder coating and I had bought new bushes to replace them. Unfortunately the new powder coating took a bit of abuse as the arms wouldn’t fit or sit straight in the vice while I had to chisel out the old bushes. It wasn’t easy but I managed it under the guidance of Paul. The rear suspension was set up by Paul and I had asked that it be kept at standard ride height, for now.

For the sharp eyed, the spring plates are up side down in the top left photo and were later swapped over to their correct side. A week after these pictures were taken, the rear hubs were built up with new bearings along with new seals and the brakes (with the cleaned up new drums) rebuilt with new cylinders, brake shoes and fixings.

Nearly there, or so I thought.