
October 2021, and Paul delivered the the floor pan back home. Leading up to this point, I had stripped down the front struts with other steering components in readiness for sending away to be powder coated in the same bright white. I had tinkered with painting the gear lever gloss white but it wasn’t quite the right white when compared with the powder coating bright white and I also touched up the scuffed IRS arms with white Hammerite.

The next part of the plan was to get the brake master cylinder sent away for refurbishment, buy a couple of new flexi brake lines for the rear end with a little more pipe work added and the brake system would be mostly finished except for the front end connections to the front struts. However, with the ongoing body work during November, the budget was draining away and these items would have to go on hold.
Next post, the body.