
Dec 2022 – Jan 2023: Stripping out the dash, the wiring and finally removing a stubborn steering column were the last of the jobs to reduce the body shell down to a… shell. The wiring loom was left in place as I hadn’t found any suitable cord or cables to re-route and pull it through to maintain a method for replacing with a new loom, in the future.
One job that I was keen to get done was to ensure the left and right handed Bakelite heater tubes that mount through the rear cross member were in position with the holes drilled for mounting. It turned out the oval holes were not big enough for the Bakelite heater tubes and I had to grind out the ovals. Luckily I had a Dremel (4000) with a couple of grinding attachments, one of which broke 3/4 of the way through the job on one of the apertures. It took over an hour of careful grinding on each side for the tubes to fit flush and enable me to mark up and drill the holes for the mounting bolts. The heater branch pipes were mocked up and fitted well which began to make things were moving in the right direction.








The bolts will need to be welded to the cross member, as per on the original panels which would make installation of the heater pipes much easier when the body is back on the floor pan. By mid January 2023, It got very cold (sub zero) and enthusiasm waned for the remainder of the month.